Thursday, August 30, 2007

Bathroom Project

Last week, we bought a new washer and dryer. We have been wanting a stackable set ever since we moved in 11 years ago...the main reason being our desire to put a shower in the downstairs bathroom, which is also the room where the washer and dryer are. Anyway, we finally splurged and got the set we wanted.

Our house is ca. 1840s and nothing is ever easy making renovations. Last winter the toilet had leaked and as a consequence, some of the flooring was getting spongy.

Brian preceded to tear the downstairs bathroom apart. He removed the old washer and dryer, the vanity and sink and the toilet.

Old washer/dryer and the mess they left behind!


Repairing the floor was next. He had to take up all the old flooring until he reached solid subfloor. Some time or other, two floors had been put down on top of the subfloor. The odd thing was is that new floors were not level, but the subfloor was. They had shimmed the flooring and actually made the floor unlevel...go figure. Bri put down new base floor and flooring.

Bri tearing up the old flooring and getting some help from Dan


He moved and replaced all the wiring and plumbing associated with the washer and dryer and put in new plumbing joining the drain for the toilet to the cast iron drain pipe.

The final stage was resetting the toilet, vanity and sink and setting up the new washer and dryer.

The new base flooring and flooring


This is only phase one of the project we have planned for this bathroom which eventually will mean gutting the room a lot more than we did and installing a shower and new fixtures.

I am very, very happy with the new washer and dryer and so glad that the bathroom was only out of order for three days!

The new washer and dryer

9 comments:

Anonymous said...

Excellent!

Is this your second bathroom?

Lisa in Jax said...

Wow! He sure did get alot done! The new washer and dryer look great!

Funny that the subfloor was level and the top floors weren't.lol

Cynthia said...

WOW! I'm impressed... it's been MONTHs and our bathroom is still not working! (LOL)! But one more week and we should see progress! They are laying the linoleum a week from today and then we'll start to see the noticeable changes - the sink will be put back in, the new curtain hung, etc.

Debbie said...

Dorothy, yes this is our 2nd bathroom, but the one the kids use most. It was nice to have it only out of order for 2 days.

Lisa, I'm not sure what is going on with the floors. I have a feeling that they matched it with the floor in our hall, which is also probably not level! Old houses, you have to love them to work on them.

Cynthia, this was just a small portion of what Bri wants to do. The next phase will require removing everything again and tearing out most of the room...walls and all, so that will take a bit longer. Brian is a dogged worker and enjoys it. I just need to allow him the time and not bug him about doing other things.

DeEtta @ Courageous Joy said...

The washer/dryer look great! I can't imagine the work in a project like this. I'm impressed at those who dig in and do it.

I love your old house.

Kristine said...

Debbie, I'm so excited that you were able to get this washer! And how wonderful that Brian can do all of this work.

Jodi said...

Your new washer and dryer look great!

Excellent that the work was done so quickly.

berrypatch said...

It looks great, Deb! :-)

Kathy in WA said...

Debbie - once again I have to say you are very, very blessed to have such a handy husband (even if he does insist on traveling far too much this summer). How wonderful that he is able to tackle all those projects and actually complete them (without making it worse or throwing a tool or spare toilet out the window, hypothetically speaking). :)